ITB 25-024
ICN OSP Project # 23230205 Clinton Co
Request for Bids
Clinton
Description
ICN requires relocation of existing 4 fiber cable along N Bluff from N 6th St to Springdale Dr in Clinton, IA. Relocation will consist of placement of approximately 970-ft of minimum of 1.25-in HDPE. Contractor will place a total of two (2) handholes with lids set at grade. A new 48-strand OSP armored fiber optic cable shall be placed through the new conduit and coiled evenly in both handholes. Existing ICN handhole at N Bluff Blvd/Springdale Dr will need to be removed after both IRHTP and Segra cables have been removed after the splice.