26CRDPBRRICH-0001
ADA Door Replacement, Maquoketa Caves State Park, Jackson County, Iowa
Request for Bids
Jackson
Description
Verify actual locations and elevations with DNR Engineer.
All work shall conform to and be performed in accordance with all applicable codes and ordinances.
The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to bidding and the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the plans, specification, special provisions and contract.
The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to proceeding with the work.
It shall be the contractor's responsibility to provide waste areas or disposal sites for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites. No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.
The contractor shall not disturb desirable grass areas and desirable trees outside the construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the DNR Engineer.
Where utilities and fixtures are shown as Existing on the plans or encountered within the construction area, it shall be the responsibility of the contractor to notify the DNR Engineer of those utilities prior to the beginning of any construction. The contractor shall be afforded access to these facilities for necessary modification of services. Underground facilities, structures and utilities have been plotted from available surveys and records and therefore their locations must be considered approximate only. It is possible there may be others, the existence of which is presently not known or shown. It is the contractor's responsibility to determine their existence and exact location and to avoid damage thereto. No claims for additional compensation will be allowed to the contractor for any interference or delay caused by such work.
The contractor shall shape graded area to maintain surface drainage. All elevations are to finish grade.
The contractor is expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control features on the project. This may involve seeding, silt fence, rock ditch checks, silt basins or silt dikes.
NO WORK FROM 12 NOON FRIDAYS, UNTIL THE FOLLOWING MONDAY.
For bid package documentation, including bid proposal, please contact Ryland Richards at 563-659-7269 or ryland.richards@dnr.iowa.gov.
BID CLOSING DATE AND TIME: 8/7/2025 AT 3:00 PM CST!
*Bids must be submitted as per the General Information and Instructions to Bidders
Agency Information
542
Natural Resources, Dept Of
6200 Park ave
DES MOINES, IA 50321
Contact Information
Valid Dates
7/7/2025 9:41:00 AM
8/7/2025 3:00:00 PM