Iowa Department of Administrative Services

State of Iowa Bid Opportunities

 

Active Bid Opportunities

Bid Information

19CRDWBAKULO-0001

Water Control Structures, Otter Creek, Tama County, Iowa

Request for Quotes

Tama

Description

Contractor shall remove and replace the east existing water control structure with new water control structure and install a new water control structure at the west location. Water control structures shall be constructed of corrugated steel pipe with a minimum gage of 14. Elevations and alignments of the east structure shall not change. Alignment and elevations shall be provided by owner for the west structure. Coupling bands shall have corrugations to match pipe ends. Stop logs and lifting hook shall be provided by owner. All other haudware, labor, and pipe disposal shall be incidental to the project. Additionally, a ditch shall be excavated approximately 85 feet long to connect the control structure with an existing trail culvert. The ditch cross section shall have 1:1 side slopes. Waste material may be placed on site as directed by the owner. Owner shall seed disturbed areas upon completion of work. For bid package documentation, please contact Adam Kulow at (641) 481-6027 or Adam.Kulow@dnr.iowa.gov. Bid Closing Date and Time: 4/11/2019 at 3:00 PM CST

Agency Information

542

Natural Resources, Dept Of

502 E. 9th Street


Des Moines, IA 50319

Contact Information

Kim Bohlen

Purchasing Agent


(515) 725-0733



Valid Dates

3/20/2019 8:30:00 AM

4/11/2019 3:00:00 PM

Documents/Attachments

Links

Want to receive email notifications about this bid? Sign up here!
Loading...