Active Bid Opportunities
Bid Information
                    EOF-24-01
                
            
                    Heartland East 23-24 Batch and Build Edge of Field Project
                
            
                    Request for Bids
                
            
                    Cedar
                
            Description
                    This project includes 14 bioreactors and 25 saturated buffer structures located in Cedar, Scott, Johnson, and Muscatine Counties. The estimated cost range for this project is $550,000 and $565,000. Some of the materials required for this project include: 55 water control structures (WCS), 4136 cubic yards of woodchips, 2945 square yards of geotextile fabric, perforated and non-perforated piping, outlet structures, amidst other items. In general, the work involves, and is not limited to, excavation, earthwork, grading, mobilization, and seeding.
                
            Agency Information
                    009
                
            
                    Agriculture and Land Stewardship
                
            
                    502 E 9TH ST
                
            
                    Des Moines, IA 50319
                
            Contact Information
Valid Dates
                    5/2/2024 1:00:00 AM
                
            
                    5/29/2024 3:00:00 PM
                
            Documents/Attachments
Want to receive email notifications about this bid? Sign up here!
 Loading...