Description
Completion Dates:
Construction: November 1st, 2027
Seeding: December 15, 2027 (must follow the seeding period)
This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure and seeding. This project includes about 62,120 cubic yards of earthwork, installation of 1,044 square feet of steel sheetpile, Aluminum CMP water control structure, 814 linear feet (LF) of tile installation, 57 LF of Aluminum CMP drawdown pipe, 2 Aluminum CMP inlet risers, 618 tons of riprap, 104 cubic yards of concrete grout and 23.1 acres of seeding. The estimated construction cost range for this project is $475,000 to $575,000.
Agency Information
009
Agriculture and Land Stewardship
502 E 9TH ST
Des Moines, IA 50319
Contact Information
Valid Dates
11/23/2026 6:35:00 AM
12/30/2026 3:00:00 PM
Documents/Attachments
Want to receive email notifications about this bid? Sign up here!
Loading...