26-05 Wri922420D (Wright)
26-05 Wri922420D (Wright)
Request for Bids
Wright
Description
This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile installation, tile installation, water control structure and seeding. This project includes about 12,950 cubic yards of earthwork, installation of 932 square feet of steel sheet pile, water control structure, 2,500 linear feet (LF) of tile installation, 59 LF of drawdown pipe, 532 tons of riprap, 106 cubic yards of concrete grout and 26.3 acres of seeding. The estimated construction cost range for this project is $450,000 to $550,000.
Completion Dates:
Construction: June 15, 2027
Seeding: June 30, 2027 (Buffer Seeding must be done within seeding period)
September 15, 2027 (Structure Seeding must be done within seeding period)
Agency Information
009
Agriculture and Land Stewardship
502 E 9TH ST
Des Moines, IA 50319
Contact Information
Valid Dates
6/14/2026 12:49:00 PM
7/16/2026 3:00:00 PM
Documents/Attachments
Links
Want to receive email notifications about this bid? Sign up here!
Loading...